Imperial Icvg Fan 115V W/16 Long Lead Wires Part# 33648-115

Imperial Icvg Fan 115V W/16 Long Lead Wires Part# 33648-115

In-Stock

$65.42
Manufacturer: Imperial
Genuine OEM Part
Ship to
*
*
Shipping Method
Name
Estimated Delivery
Price
No shipping options
Easy Returns, Manufacturer Warranty, Fast Shipping

Manufacturer part number: 33648-115

Imperial Icvg Fan 115V W/16 Long Lead Wires Part# 33648-115

Fan, Axial, 115V, 50/60HZ, 16 Wire Lead, ICVG

Weight: 2 lbs. Dimensions: Not Available

Compatible Models: Not Available